"Western Electric Networks"
![]() |
| Zoom
![]() |
121293, Moscow, 15 Year of 1812 street,
E-mail: zes@zes.ru
|
Director – Alexander Igorevich Yakunin Visitor hours: 1st and 3rd Monday of each month (16:00 - 18:00) Reception: 8-499-148-93-35 Fax: 737-88-74: 8(495)737-88-74 |
Chief engineer – Ivanov Viktor Ivanovich Visitor hours: 1st and 3rd Monday of each month (16:00 - 18:00) by previous appointment Reception: 8-499-148-93-35 Fax: 737-88-74 |
It is possible to apply to distribution zones to get information on coordination of project documents, land uptakes and etc. Connection to power grids “hot-line” phone number is 8-(4967) 65-28-15
Distribution zones’ addresses: (download)
To get information on connection to power grids, please apply to clients’ service department: 8-499-148-76-65.
In case of emergency please call the dispatcher-informer: 8-495-448-80-82.
Branch History:
Western Electric networks were established on December 14, 1953 on the basis of the former 11th district of high voltage grids.
Electric networks enterprise Western electric networks branch of OJSC “MOESK” was established in the structure of Open Joint-Stock Company “Moscow United Electric Grid Company” on January 1, 2008 in accordance with OJSC “MOESK” Articles of Association by means of Volokalamskiye, Mozhaiskiye and Western electric networks merging with the personnel of 1,720 persons.
The service area consists of 8 administrative districts of the Moscow Region:
- Odintsovsky
- Istrinsly
- Naro-Fominsky
- Lotoshinsky
- Shakhovsky
- Ruzsky
- Mozhaisky
- Volokolamsky.
Since January 1, 2008 eight distribution zones of Western electric grids began their work on the territorial basis. Their main goal is to provide uninterrupted power supply by means of 35-220 kV substation technical service and distribution networks of 0.4-10 kV not exceeding the norms of technological losses.
Goals and technical characteristics:
The main goal is to provide the reliable power supply of the consumers within the responsibility zone and services rendering directed to connection to power grids. Today, Western electric networks actively carry out the construction and reconstruction of main substation and also of the power transmission lines in the west of the Moscow region where one can observe the dynamic construction of many industrial and socially important objects.
Western electric networks (WEN) branch of OJSC “MOESK” provides service to 95 thousand of c.u. of power grids equipment on the territory of 8 administrative districts of Moscow region of total area more than 10 thousand square km.
Amount of equipment, lines length being on the branch balance:
103 high voltage substations of 35/110/220 kV and 5,358 transformer substations; the high voltage lines length accounts for 04/6/10kV – nearly 13 thousand km, 35/110/220 kV – 3,196 k; 35kV cable lines length is nearly 122 km.